SMI Road Closure – Augustus Way on Tuesday 9th January

The developer Countryside’s contractor, Tamdown, will be carrying out necessary road remedial works in Augustus Way between 8 am and 5 pm.

To ensure that the works can be carried out in a safe environment it will require a road closure.  All access will be by the secondary access bridge by the marina.

 

Back To Top