
SMI Road Closure – Augustus Way on Tuesday 9th January
The developer Countryside’s contractor, Tamdown, will be carrying out necessary road remedial works in Augustus Way between 8 am and 5 pm.
To ensure that the works can be carried out in a safe environment it will require a road closure. All access will be by the secondary access bridge by the marina.


