Chatham Maritime Marina Lock – Shutdown for Annual Maintenance

MDL are preparing for the annual shutdown of the lock at Chatham Maritime Marina to enable maintenance works.  The lock will be shutdown from 10th January 2022 and, all being well, all works should be completed by 30th January.

 

Back To Top